VCU Arts & Innovation Academic Building

VCU Arts & Innovation Academic Building | Richmond, VA

General works, site logistics, construction support, multi-trade coordination

Supporting the delivery of a complex, multi-level academic facility through precise execution, protection, and site coordination.

Completion Date

2026–2027

Overview

River City Enterprises partnered with Hourigan Construction to provide essential general works for the VCU Arts & Innovation Academic Building—a highly specialized, multi-level facility designed for performance, media production, and academic instruction.

The building includes a wide range of technical environments such as media studios, sound and AV labs, performance spaces, and classrooms, requiring careful coordination and protection throughout construction.

River City’s role focused on maintaining site integrity, protecting high-end finishes, and supporting seamless execution across all trades during the construction process.

Scope of Work

  • Implementation of comprehensive flooring protection across specialty surfaces including:

    • Dance studio flooring

    • Luxury vinyl tile (LVT)

    • Polished concrete

  • Installation of temporary doors and site controls to secure sensitive areas such as:

    • Media production studios

    • Sound and AV labs

  • Construction support for signature architectural elements including:

    • Custom concrete signage wall

  • Daily construction cleaning and site maintenance across all levels of the facility

  • Coordination of general works to support multi-trade workflow and protect architectural finishes

Impact

Protection of High-Value Architectural Finishes
Specialized flooring and surface protection ensured that premium materials remained in pristine condition throughout construction.

Maintained Site Control and Security
Temporary door systems and controlled access protected sensitive spaces such as media studios and AV environments during active construction.

Efficient Multi-Trade Coordination on a Complex Facility
Consistent site maintenance and logistical support enabled smooth collaboration across trades within a highly technical, multi-level academic building.

Previous
Previous

Osborne Residential Addition